Building Department Required Inspection
New residential
- Footer
- Prepour wall
- Foundation, waterproofing, drain tile, down spouts, anchor bolts, wall bracing
- Plumbing Rough
- Electrical rough
- HVAC rough
- Building Rough
- Insulation
- Plumbing final
- Electrical final
- HVAC final
- Building final
Deck
- Postholes
- Rough framing
- Final
Remodel
- Rough/ final plumb
- Rough/ final electric
- Rough/ final HVAC
- Rough/ final build
Waterproofing
- Rough with final
We do not accommodate same day inspections, 24- hour advanced notice is required. Inspections are required to be requested though the CitizenServe portal. The City of Streetsboro has 96 business hours to accommodate your request.