Search results

1873 Results Found

Commercial review can take up to 30 business days and are sent out to a 3rd party for review. The average review time for residential projects can take up to 7-10 business days.

2 – Topos, stamped by a surveyor 2 – Blueprints Sewer permit or Septic permit (obtained through Portage County Water Resources 330-297-3670) Permit applications – Building, Electrical, Plumbing and HVAC (they must be submitted together) Model Energy Code Zoning application Water permit (obtained at Service Dept. – 330-626-2856) Mud Bond (obtained through Engineering Dept. 330-626-4942)...

If the structure is over 220 sq. ft. a building permit is required along with the zoning permit If the structure is under 220 sq. ft. a building permit is not required, however you will still need to obtain a zoning permit

Close window